CER 2439,
“Investigation of the Design Requirements of GFRP Rebars in Concrete Structures”, (Project Manager), Saudi Aramco, October 2018-October 2021, Budget: SR 1,805,342.

CER 2439-Task,
“Investigating the Long-Term Durability of High Quality Concrete in the Arabian Gulf Environment”, (Principal Investigator), Royal Commission for Jubail and Yanbu, September 2017-August 2020, Budget: SR 2,900,000.

CER 2415-Task,
“Investigating the Long-Term Durability of High Quality Concrete in the Arabian Gulf Environment”, (Principal Investigator), Royal Commission for Jubail and Yanbu, September 2014-August 2017, Budget: SR 2,900,000.

CER 2365-Task II
”Investigating the Long-Term Durability of High Quality Concrete in the Arabian Gulf Environment”, (Principal Investigator), Royal Commission for Jubail and Yanbu, September 2012-August 2014, Budget: SR 2,900,000.

CER 2415,
“Corrosion Research” “Long-Term Durability Research on High Quality Concrete in the Arabian Gulf Environment”, (Principal Investigator), RCJY, 2013-2017, Budget: SR 3,997,115.

CER 2323,
“Corrosion Research” “Long-Term Durability Research on High Quality Concrete in the Arabian Gulf Environment”, (Principal Investigator), RCJY, 2007-2010, Budget: SR 2,928,800.

SAB 2004/13,
“Protection Through Chemical Inhibitors in Blended Cement Concrete Structures Reinforced with Surface Damaged FBEC Bars”, (Principal Investigator), KFUPM/SABIC-Grants, April 2004-December 2005, Budget: SR 75,000.

CER 2278,
“Protection Through Chemical Inhibitors in Reinforced Concrete Structures with Fusion Bonded Epoxy Coated Bars”, (Principal Investigator), Saudi ARAMCO, January 2004-2005, Budget: SR 548,147.

CER 2279,
“Determination of Chloride Threshold Value and Service Life Estimation of RC Structures with Hadeed-Sabic Rebars”, (Project Manager), SABIC R&T, November 2003-2005, Budget: SR 368,445.

CER 2265,
“Corrosion Research” “Long-Term Durability Research on High Quality Concrete in the Arabian Gulf Environment”, Principle Investigator, RCJY, September 2003-August 2006, Budget: SR 1,137,682 (for all Tasks).

CER 2265,
“Corrosion Research” “Assessing Mix Materials, Durability, and Beneficial Effects of Self-Compacted Concrete”, Principle Investigator, RCJY, September 2003-August 2006, Budget: same budget.

CER 2265,
“Corrosion Research” “Minimizing Shrinkage Cracking in Silica Fume Concrete Exposed to Hot Weather”, (Member), RCJY, September 2003-May 2005, Budget: same budget.

CER 2265
“Corrosion Research” “Evaluating Performance of Proprietary Anti-Corrosive Rebar Coatings for Use in Reinforced Concrete to Retard Rebar Corrosion”, (Member), RCJY, September 2003-In progress, Budget: same budget.

CER 2266,
“Development of a Construction Material System for Sulfur Pits”, (Member), Saudi ARAMCO, June 2003-June 2006, Budget: SR 350,000.

SAB 2003/03,
“Effect of Sulfate Concentration and Cation Type on Sulfate Attack in Plain and Blended Cements”, (Principal Investigator), KFUPM/SABIC-Grants, April 2003-December 2004, Budget: SR 75,000.

CER 2246,
“Galvanic Cathodic Protection of Restored Concrete Elements and Structures”, (Member), Saudi ARAMCO, February 2003-May 2005, Budget: SR 336,600.

CER 1263,
“Investigation of the Causes of Settlement of Floor Slabs in Station # 24 and Building # 25”, (Member), KFUPM, January 2003-April 2003, Budget: SR 98,750.

CER 2242,
“Durability of GFRP Bars Under Aggressive Local Exposure Conditions”, (Project Manager), Saudi ARAMCO, June 2002-2005, Budget: 1,196,608.

SAB 2001/01,
“Assessment of GFRP Bars Under Aggressive Exposure conditions”, (Project Manager), KFUPM/SABIC-Grants, April 2002-December 2003, Budget: SR 75,000.

CER 2227,
“Effect of Dust in Aggregates and the Chloride Concentration in Soil on Concrete Durability”, (Principal Investigator), Saudi ARAMCO, April 2001-March 2003, Budget: SR 400,000.

ARP 19-10,
“Inhibition of Reinforcing Steel Corrosion Under Atmospheric Condition”, (Principal Investigator), KACST, December 2000-Novemebr 2003, Budget: SR 486,800.

CER 2209,
“Corrosion Research” “Establishment of Long-Term Field Station to Study Durability Research on High Quality Concrete in the Arabian Gulf Environment”, (Principle Investigator), RCJY, September 2000-August 2003, Budget: SR 2,950,860 (for all Tasks).

CER 2209,
“Corrosion Research” "Performance of Existing Reinforced Concrete Structures Made with Concrete Containing Mineral Admixtures in Madinat Al-Jubail Al-Sinaiyah”, (Member), RCJY, September 2000-September 2001, Budget: same budget.

CER 2209,
“Corrosion Research” “Assessment of Chloride Threshold Concentration for Initiation of Reinforcement Corrosion in the Arabian Gulf Environment”, (Member), RCJY, September 2000-August 2003, Budget: same budget.

PN 20013,
"Specifications for Silica Fume to Produce Durable Concrete”, (Principal Investigator), Saudi ARAMCO, November 1998-November 2000, Budget: SR 633,712.

PN 25090,
“Concrete Durability Research Study”, (Principal Investigator), Saudi ARAMCO, September 1997-August 2000, Budget: SR 2,167,136.

PN 25080,
“Comparative Study of the Performance of HADEED Quenched Steel Bars with Other Products in the Market”, (Principal Investigator), SABIC R&T, June 1997-February 2000, Budget: SR 1,085,000.

PN 25043 (SQ 5475),
“Inspection of Precast Concrete Corbels and Marble at Al-Waha Mall in Dammam”, (Project Manager), Al-Waha Mall, April 1996-June 1997, Budget: SR 98,000.

PN 25057,
"Corrosion Research”, (Principal Investigator), Royal Commission for Jubail and Yanbu (RCJY), April 1992-July 2000, Budget: SR 2,900,000.