KFUPM logo

 

King Fahd University of Petroleum & Minerals

Electrical Engineering Department

Associate Professor

DR. IBRAHIM OMAR HABIBALLAH

 

Technical Reports

 
 

[1] I.O. Habiballah and V.H. Quintana, "Fast-Decoupled Power System State Estimation with an Efficient Data Structure Management: Program Documentation", University of Waterloo, Waterloo, Canada, Technical Report No. UWEE 89-03, Dec., 1989.

[2] I.O. Habiballah and V.H. Quintana, "Partitioning Programs Description", University of Waterloo, Waterloo, Canada, Technical Report No. UWEE 93-01, Jan., 1993.

[3] I.O. Habiballah and V.H. Quintana, "Decomposition Program Description", University of Waterloo, Waterloo, Canada, Technical Report No. UWEE 93-02, Jan., 1993.

[4] A.M. Al-Shehri, I.O. Habiballah, J. M. Bakhashwain, and S. A. Al-Sakran, "Feasibility Study of Frequency Conversion at the Military Factory Complex in Al-Kharj", Metrology Standards and Materials Division, Research Institute, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia, June 1997.

[5] A.M. Al-Shehri, I.O. Habiballah, G. Opoku, A. Aitani, and F. Rahman, " Refinery Residue Reduction with Three Power Generation Options", Center for Refining and Petrochemicals and Center for Engineering Research, Research Institute, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia, November 1998.

[6] I.O.Habiballah, I. El-Amin, and A. Al-Shehri "Test and Evaluation of Harmonics and Flicker Levels at HADEED", January 2001.

[7] I. El-Amin, I.O. Habiballah, A. Al-Shehri, "The benefits of Interconnecting MAYS with SCECO West", MAYS, Yanbu, January 2002.

[8] S. Bakhryba, I. El-Amin, A. Al-Shehri, F. Zedan, I.O. Habiballah, S. Al-Sakran, and M. Al-Sayad, "Evaluation of Strategic Master Plan for Restructuring and Commercializing the Saudi Electricity Sector, Saudi Electricity Company, Riyadh, January 2002.

[9] I.O. Habiballah, A.M. Al-Shehri, I. El-Amin, C. Belhaj, H. Maghrabi, and M. Kassass,  “Voltage Dip Problems in the Jubail Industry Area, Saudi Electricity Company – ERB, Dammam, February 2003.

[10] Y. Abdulmajeed, I.O. Habiballah, M. Abido, and M Kassass, "Power Quality Standards", Saudi Electricity Company, Riyadh, August 2004.

[11] I. El-Amin, I.O Habiballah, A. Al-Shehri, Y. Abdel-Magid, M. Kassas, J. Bakhashwain, M. Arif, and A. Firoz "Electric Energy Production Costing for the Saudi Electricity Section Phase I", Final Reports, Electricity Services Regulatory Authority, Riyadh, May 2005.

[12] K. Al-Soufi, I.O. Habiballah, M. H. Shwehdi, and Z. Al-Hamouz, "Failure Analysis of 110 kV Cable of SCC", Final Report, Saudi Cable Company, Jeddah, June 2005

[13] I.O. Habiballah, K. Al-Soufi, M. Dawood, H. Masoudi, M. Arif, C. Belhaj, and N. Maalej  "Electric and magnetic Field Guideline Evaluation and Magnetic Field Exposure for Live-Line Workers ", Final Report, Saudi Electricity Company, Riyadh, Dec. 2005.

[14] I. El-Amin, I.O Habiballah, M. Arif, and A. Firoz "Updated Generation Planning for the Saudi Electricity Sector", Final Report, Electricity and Co-Generation Regulatory Authority (ECRA), Riyadh, Dec. 2005.

[15] A. Shash, I.O Habiballah, K. Al-Soufi, and Z. Al-Hamouz “Consortium for Establishing Central Electrical Testing Laboratory”, Final Reports,  Jan. 2006.

[16] I.O. Habiballah, K. Al-Soufi, and Z. Al-Hamouz, "Environmental Effect on Polymer Insulator Properties ", Final Report, Saudi Electricity Company, Riyadh, May 2006.

[17] I. El-Amin, I.O. Habiballah, T. Abdeljalil, A. Firoz, and M. Arif, "Development of Electricity Generation & Transmission Plan (EGTP) – Planning Basis Report", Ministry of Water & Electricity, Riyadh, April 2007.

[18] I. El-Amin, I.O. Habiballah, T. Abdeljalil, A. Firoz, and M. Arif, "Development of Electricity Generation & Transmission Plan (EGTP) – Data Report", Ministry of Water & Electricity, Riyadh, June 2007.

[19] I. El-Amin, I.O. Habiballah, T. Abdeljalil, A. Firoz, and M. Arif, "Development of Electricity Generation & Transmission Plan (EGTP) – Demand Forecast Report", Ministry of Water & Electricity, Riyadh, November 2007.

[20] A.H.M.A.Rahim and I.O.Habiballah,“Control of Doubly-Fed Induction Generator Based Wind Generation Systems”, KFUPM  Fast Track/ SABIC Grant, Sept 2008- March 2010, Research Report April 2010.

[21] Ibrahim O. Habiballah “Robust State Estimation and Monitoring of Power System Smart Grids”, Sabbatical Final Report, September 2012.

[22] I. El-Amin, I.O. Habiballah, M. Abido, "Static Synchronous Compensator Based Stabilizer Design and Implementation, KFUPM, IN090019, Feb. 2013

[23] I. El-Amin, I.O. Habiballah, M. Abido, M Al-Muhaini, A. Firoz, and M. Arif "Selection Of Optimal Transmission Voltage/Technology For The Saudi Arabian Transmission Grid Expansion: Feasibility Of", Saudi Electricity Company, Dec. 2016.

 

Disclaimer: Material are provided on this page for the sole purpose of timely information dissemination, and the copyrights belong to the authors and the corresponding publishers unless otherwise stated.

 

Copyright © 2008