[1] Feasibility Study: Frequency
Conversion at the Military Factory Complex in Al-Kharj, Military
Industry Complex, Riyadh, April 1997.
[2] Refinery Residue
Reduction with Three Power Generation Options, Saudi Aramco,
Dhahran, November 1998.
[3] Inspection of 8 HV Insulator
Test Sites to Assess Their Current Conditions, Electricity
Corporation, Riyadh, September 2000.
[4] Test and Evaluation of Harmonics
and Flicker Levels at HADEED, HADEED Co., Jubail, January 2001.
[5] The Benefits of Interconnecting
MAYS with SCECO West, Royal Commission, Yanbu, October 2001.
[6]
Evaluation of Strategic Master
Plan for Restructuring and Commercializing the Saudi Electricity
Sector, Saudi Electricity Company, Riyadh, January 2002.
[7]
Voltage Dip Problems in the Jubail Industry Area, Saudi Electricity Company – Eastern Region
Branch, February 2002.
[8]
Electric energy production costing for the Saudi Electricity Sector
(Phase-I), Elec.
Services Regul. Author., May 2005.
[9]
Failure Analysis of 110 kV Cable of SCC, Saudi Cable Co.,
June 2005.
[10]
Electric and Magnetic Field Guidelines Evaluation and Magnetic Field
Exposures, Saudi
Elec. Co, December 2005.
[11] Feasibility study for establishment of an electrical
central laboratory in Saudi Arabia, KFUPM and 11 other
organiztions, January 2006.
[12
Electric Energy Production Costing For The Saudi Electricity
Sector (Phase-II), Elec. & Cogen Regul. Author., March 2006.
[13]
Environmental Effect on Polymer Insulator Properties,
Saudi Elec. Co, May 2006.
[14]
Investigation Of Voltage
Harmonics And Unbalance In Transmission Network,
Saudi Cable Co., November 2007.
[15]
Control of Doubly-Fed Induction Generator Based Wind Generation
Systems, KFUPM Fast Track/ SABIC Grant, March 2010.