| 
        
          |  |  
          |  |  
          | 
              
                |  |  |  Journal Publications: 
                      
                        | 1 |  Elazouni, A., and Basha, I., “Evaluating the Performance of Construction Equipment Operators in Egypt,” Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 2, June (1996), pp. 109 – 114. [Download]  |  
                        | 2 |  Elazouni, A., “Constructability Improvement of Steel Silos during Field Operations,” Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 1, March (1997), pp. 21- 25. [Download]  |  
                        | 3 |  Elazouni, A., Mohieldin, Y., Nosair, I., and Mohamed, A., “Estimating Resource Requirements at Conceptual Design Stage Using Neural Networks,” Journal of Computing in Civil Engineering, ASCE, Vol. 11, No. 4, October (1997), pp. 217 – 223. [Download]  |  
                        | 4 |  Elazouni, A., and Abd El-Razek, M., “Adapting Lift-Slab Technology to Construct Submerged Pile Caps,” Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 2, April (2000), pp. 149 – 157. [Download]  |  
                        | 5 |  Elazouni, A., and Metwally, F., “D-SUB: Decision Support System for Subcontracting Construction Works,” Journal of Construction Engineering and Management, ASCE, Vol.126, No. 3, June (2000), pp. 191 – 200. [Download]  |  
                        | 6 |  Elazouni, A., Raslan, M., “Foot-bridge: Project to Implement Management Functions at AASTMT,” Journal of Professional Issues in Engineering Education & Practice, ASCE , Vol. 129, No. 1, Jan. (2003), pp 44 – 51.  [Download]  |  
                        | 7 |  Elazouni, A., and Gab-Allah, A., “ Finance-Based Scheduling of Construction Projects using Integer Programming,” Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 1, Jan. (2004), pp. 15-24. [Download]  |  
                        | 8 |  Elazouni, A., Ali, A., and Abd-Elrazik, R., “Estimating the Acceptability of New Horizontal Formwork Systems Using Neural Networks,” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 1, Jan. (2005), pp. 33-41.[Download] .  |  
                        | 9 |  Elazouni, A., and Metwally, F., “Finance-Based Scheduling: Tool to maximize Project Profit using Genetic Algorithms,” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 4, April (2005), pp. 400 – 412. [Download]  |  
                        | 10 |  Elazouni, A., "Classifying Construction Contractors Using Unsupervised-Learning Neural Networks," Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 12, Dec. (2006), 1242-1253. [Download]  |  
                        | 11 |  Elazouni, A., and Metwally, F., “Expanding Finance-Based Scheduling to Devise Overall-Optimized Project schedules,” Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 1, Jan. (2007), 86-90. [Download]  |  
                        | 12 |  Elazouni, A., and Shaikh, A., "Simulation Model for Determining Maintenance Staffing in Higher-Education Facilities," Journal of Performance of Constructed Facilities, ASCE, Vol. 22, No. 1, Jan (2008), 54-61. [Download]  |  
                        | 13 | 
						Elazouni, A., "Heuristic Method for Multi-Project 
						Finance-Based Scheduling," Construction Management and 
						Economics, Vol. 27, No. 2, (2009), pp. 199-211. |  
                        | 14 | 
						Ali, M., and Elazouni, A., "Finance-based CPM/LOB 
						Scheduling of Projects with Repetitive Nonserial 
						Activities," Construction Management and Economics, 
						Vol. 27, No. 9, (2009), pp. 839-856. |  
                        | 15 | 
						Abido, M., and Elazouni, A. "Precedence-preserving GAs 
						Operators for Scheduling Problems with Activities' Start 
						Times Encoding," Journal of Computing in Civil 
						Engineering, ASCE, Vol. 24, No. 4, July (2010), pp. 
						345-356. |  
                        | 16 | 
						Abido, M., and Elazouni, A. "Multiobjective Evolutionary 
						Finance-based Scheduling: the Entire Projects' 
						Portfolio," Journal of Computing in Civil Engineering, 
						ASCE, Vol. 25, No. 1, (2011), pp. 85-97. |  
                        | 17 | 
						
						Elazouni, A., 
						Abdel-Wahhab, O., "Progress Monitoring of Construction 
						Projects using Pattern Recognition Techniques" 
						Construction Management and Economics, Vol. 29, No. 4, 
						(2011), pp. 355-370. |  
                        | 18 | 
						
						Elazouni, A. and 
						Abido, M. "Multiobjective Evolutionary Finance-based 
						Scheduling: Individual Projects within a Portfolio," 
						Automation in Construction, Vol. 20, No. 7, (2011), pp. 
						755-766. |  
                        | 19 | 
						
						Alghazi, A., Selim, 
						S., and Elazouni, A. "
						
						
						Performance of shuffled frog-leaping algorithm in 
						finance-based scheduling," Journal of Computing in Civil 
						Engineering, ASCE (accepted). |  
                        | 20 | 
						
						Elazouni, A., and 
						Abido, M. “Bank finance decisions for fund allocation to 
						contractors using multi-objective evolutionary 
						optimization,” Construction Management and Economics, 
						(revised an resubmitted to fulfill the comments of the 
						first round of revision). |  
                        | 21 | 
						
						Alghazi, A., Selim, 
						S., and Elazouni, A. "Improved Genetic Algorithm for 
						Finance-based scheduling," Journal of Computing in Civil 
						Engineering, ASCE, (submitted). |  
                        | 22 | 
						
						 Alghazi, A., Selim, 
						S., and Elazouni, A. " Finance-based scheduling using 
						Metaheuristics: discrete versus continuous optimization 
						problems," Journal of Computing in Civil Engineering, 
						ASCE, (submitted). |  
                        |  Conference Publications:  |  
                        | 1 |  Elazouni, A., “A knowledge-based Approach for Decisions regarding Maintenance Contracting,” Proceedings of the 1 st Transportation Specialty Conference, Canadian Society for Civil Engineering, Edmonton, Canada, Vol. IIIb (1996), pp. 37–48.  [Download]  |  
                        | 2 |  Elazouni, A., and Gab-Allah, A., “A Framework for developing Proactive Approaches for Concurrent Construction,” Proceedings of the 6th International Conference for Building and Construction (Inter Build 99), Cairo, (1999), pp. 407– 417 [Download] .  |  
                        | 3 |  Elazouni, A., El-Kasaby, S., and Metwally, F., “A Decision Support System for Maximizing Contractor Actual Profitability,” Proceedings of the 6th International Conference for Building and Construction (Inter Build 99), Cairo, (1999), pp. 393–405.  [Download]  |  
                        | 4 |  Elazouni, A. "Masterformat-based System for Evaluating the Performance of Construction Projects using Backward Chaining," Proceedings of the 6th Saudi Engineering Conference, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia, Vol. 1 (2002), pp. 5-19.  [Download]  |  
                        | 5 |  Basha, I., Gab-Allah, A., and Elazouni, A. "Project-based Course for Practicing Construction Project Management," Proceedings of the 6th Saudi Engineering Conference, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia, Vol. 1 (2002), pp. 289–302.  [Download]  |  
                        | 6 |  Elazouni, A. "Comparison of Cluster Analysis and Unsupervised-Learning Neural Networks in Classifying Construction Contractors" Proceedings of the 1st International Construction Specialty Conference, Canadian Society for Civil Engineering, Calgary, Canada, 2006.  [Download]  |  
                        | 7 |  Elazouni, A. "Finance-based Scheduling: A potential enhancement of construction scheduling techniques" Proceedings of the 2007 Construction research congress, ASCE, Grand Bahama Island, Bahamas, May 6-8, 2007.  [Download]  |  
                        | 8 |  Elazouni, A., Abdel-Wahhab, O., "Progress 
						Monitoring of Erection of Off-Site Produced Units Using 
						Pattern Recognition "Proceedings of Construction 
						Management and Economics 25 Conference, University of 
						Reading, UK, July 16-18, 2007. [Download]  |  
                        | 9 |  Elazouni, A., Abdel-Wahhab, O., "Progress 
						Monitoring of Erection of Off-Site Produced Units Using 
						Pattern Recognition "Proceedings of Construction 
						Management and Economics 25 Conference, University of 
						Reading, UK, July 16-18, 2007. [Download]  |  
                        | 10 | 
						Elazouni, A., Abdel-Wahhab, 
						O., "Progress Monitoring of Construction Projects Using 
						Neural Networks Pattern Recognition" Construction 
						Research Congress CRC, Seattle, USA, April 5-7, 2009. |  
                        | 11 | 
						Abido, M., and Elazouni, A., "Improved crossover and 
						mutation operators for Genetic-algorithm project 
						scheduling,"  
						
						2009 IEEE Congress on Evolutionary Computation, 
						 
						
						
						Trondheim, Norway, May 
						18-21, 2009. |  
                        | 12 | 
						Elazouni, A., Abdel-Wahhab, O., "Using 
						statistical pattern recognition to monitor the erection 
						progress of off-site produced units" 
						7th joint Conference of APSEC and 2nd 
						EACEF, Langkawi, Malaysia, Aug. 4-6, 2009. |  
                        | 13 | 
						
						Elazouni, A. and 
						Abido, M. "Finance-based Scheduling of Multiple 
						Construction Projects using Multiobjective Evolutionary 
						Algorithms" 2nd International 
						Construction Specialty Conference, Canadian Society of 
						Civil Engineers, St. John’s, Canada, May 27-30, 2009.
						
						 |  
                        | 14 | 
						Abdel-Wahhab, O., and Elazouni, A., "Progress Monitoring 
						of Construction Projects Using Statistical Pattern 
						Recognition" Construction Research Congress CRC, Banff, 
						Canada, pp. 1204-1213, May 8-10, 2010. |  
                        | 15 | 
						Abido, M., and Elazouni, A., " Multiobjective evolutionary 
						Finance-based scheduling: the entire projects' 
						portfolio," Proceedings of The International Conference 
						on Computing in Civil and Building Engineering,
						
						
						W. Tizani 
						(Editor),
						
						
						Nottingham, U.K, 
						University of Nottingham Press, Paper 200, PP. 399, June 
						30-July 2, 2010. |  
                        | 16 | 
						Ahmed, M., Elazouni, A., and Zayed, T., "Assessment of 
						Activities Criticality Related to Cash Flow Parameters"
						
						
						
						3rd International/9th Construction Specialty Conference, 
						Canadian Society of Civil Engineers, Ottawa, Canada, 
						June 14-17, 2011. |  
                        |  Research Projects:  |  
                        | 1 |  Elazouni, A., Classifying construction contractors using Unsupervised-learning neural networks, SABIC-2005-006 grant.  [Download] |  
                        | 2 |  Elazouni, A., Finance-based Scheduling of Repetitive Projects Using Genetic Algorithms, FT-2006-14.  [Download] |  
                        | 3 |  Elazouni, A; and Abido, M., Finance-based Scheduling of Multiple Construction Projects, SB-2007-12.  [Download] |  
                        | 4 |  Elazouni, A ., Utilization of Pattern Recognition Techniques to Monitor the Progress of Construction Projects, SB-2008-11.  [Download] |  
                        | 5 | 
						
						Elazouni, A; and 
						Abido, M., "Finance-based Scheduling of Construction 
						Projects using Evolutionary and Heuristic algorithms," 
						KFUPM internal fund/2008 grant (215,100SR), from Sept 1, 
						2008 till Sept 1, 2010. |  
                        | 6 | 
						
						Elazouni, A., 
						“Simulation approach for scheduling based on fund 
						availability for sustained Saudi contracting business,” 
						KFUPM internal fund/2009 grant (193,995), from June 18 
						2010 till Dec. 12 2010. |  
                        |  Patents: |  
                        | 1 |  Elazouni, A., “Discrete-event Simulation Based Method for Staffing Highway Maintenance Crews” U.S.A Patent No. 5,617,342, (1997).  [Download] |  
                        | 2 | 
						
						Elazouni, A., 
						“Method and Apparatus  for Finance-Based Scheduling of 
						Construction Projects” U.S.A Patent No. 7,644,007 
						(2010). |  
                        | 3 | Elazouni, A., and 
						Abdel-Wahhab, O., "Design and process scheduling 
						optimization method" U.S.A Patent Application No. 
						12,585,237 (2009).  |  
                        | 4 | 
						
						Abido, M., and 
						Elazouni, A., "Method of generating 
						precedence-preserving crossover and mutation operations 
						in Genetic algorithms" U.S.A Patent Application 
						No. 12,588,210 (2009). |  
                        | 5 | 
						
						Elazouni, A., and 
						Abdel-Wahhab, O., "Progress monitoring of construction 
						projects using pattern recognition techniques" U.S.A 
						Patent Application No. 12,854,132 (2010). |  
                        | 6 | 
						Elazouni, A., 
						“Extending activities floats in the Critical Path 
						Method” U.S.A Patent Application No. 12,848,907 
						(2010). |  
                        | 7 | 
						
						Elazouni, A., 
						Abido, M., Selim, S., and Alghazi, A., “Method of 
						Repairing Financially infeasible Genetic Algorithm 
						Chromosome Encoding Activity Start Times in Scheduling”
						
						
						U.S.A Patent Application No. 12/872,690 (2010). |  |  |  
          |  |  |