Projects

 Home Up Accepted Proposals

               

No.

Project

Responsibility

(1)

PN24109 Assessment of Toxicants in Commercial Species of Fish from the Arabian Gulf. Funded by MEPA (8 months @SR 100,000)

Member

(2)

PN 14130 Investigation of the Effect of PVC Additives on Drinking Water Quality. In-house Project (6 years and 3 months @ SR 50,000).

Project Manager

(4)

PN24150 Contaminant Transport Model for the Ras Tanura Groundwater Investigation. Funded by Saudi Aramco (16 months @SR 262,248).  

Task Leader

(5)

PN24162 Investigation of Ambient Concentrations of Automotive Emissions in Three Major Cities. Funded by Saudi Aramco (12 months @SR 101,2976).. 

Task Leader

(6)

PN24163 National Inventory of Anthropogenic Emissions by Sources and Removal by Sinks of Greenhouse Gases not Controlled by the Montreal Protocol. Funded by Saudi Aramco (19 months @SR 576,698). 

Task Leader

(7)

PN24153 Implementation and Supervision of a Slow Sand Filter for Saudi Fisheries Company at West of Al-Awjam. Funded by Saudi Fisheries.

Member.

(8)

PN24132 Characterization of Wastewater Samples from a Corrugated Carbon Box Plant. Funded by EASTERNPAK (4 weeks @ SR 10,000).  

Member

(9)

CEW24169 Environmental Impact Assessment of Medical Wastes Disposal Facilities. Funded by Kaid Al Injaz Company for the Destruction of Hazardous Waste (KAID) (16 months @SR155636).

Task Leader

(10)

CEW2214 Environmental Impact Assessment of a Medical Wastes Disposal Facility, funded by Saad Trading and Contracting Company (6 months @SR 91,680). 

Task Leader

(11)

CEW2215 Survey Quantities and Contents of Solid Wastes in Kingdom of Saudi Arabia, funded by Kuwait Environmental Protection Society (6 months @ SR69,000).

Project Manager

(12)

CEW2228 Survey of Feasibility Studies of Domestic Solid Waste Recycling in Saudi Arabia, And Recycling Process in the Eastern Province of Saudi Arabia, funded by Kuwait Environmental Protection Society (6 months @ SR60,937).

Project Manager

(13)

AR-18-28 Characterization, Utilization and Disposal of Municipal Sludge, funded by King Abdulaziz City for Science and Technology (18 months @ SR 489400). 

Principle Investigator

(14)

CER2209- Task 8.1 Study of Biodegradation of Municipal Solid Waste and Groundwater Contamination, (Phase 1: Literature Survey and Situation Assessment), funded by The Royal Commission for Jubail and Yanbu (8 months @ 191,400). 

Leader of Task 8.1

(15)

CEW2233 Sustaining research project-Marine environmental studies Phase IV, funded by Saudi Aramco (5 years @ SR 7,420,000). 

Task Leader

(16)

CEW2226 Investigation of Pollution Problems in Dammam Corniche Water, funded by the Directorate of Dammam (14 months @ SR 371,795). 

Task Leader

(17)

CEW2229 Management of Ash Waste Generated at Rabigh Power Plant, funded by Saudi Company for Environmental Works Ltd. (7 months @ SR 344,153). 

Task Leader

(18)

CEW2234 Recycling Waste Office Paper in KFUPM/RI: A Case Study, funded by Kuwait Environmental Protection Society (9 months @ SR121,140).

Project Manager

(19)

PNQCEW706 Design of a General Layout of an Integrated Hazardous Waste Disposal Facility, funded by A. M. Al-Kalthomi Establishment for Trading and General Contracts (4 months @ SR 27,833). 

Member

(20)

CEW2249 An Environmental Study at Al-Bawardi Metal alloys Plant, funded by Al-Bawardi Metal alloys (4 months @SR 185,000).

Task Leader 

(21)

CEW2240 Field Measurement of Stack Gases for Combustion Facilities and Study for Air Monitoring Stations in Al-Khafji City, funded by Al-Khafji Joint Operations (10 months @ SR 749,810).

Member

(22)

CEW2252 Study of Electric and Electronic Waste Management, funded by Kuwait Environmental Protection Society(6 months @ SR 91,000).

Project Manager

(23)

CEW2261 Environmental Impact Assessment of an Integrated Hazardous Waste Management Facility in the Eastern Province, funded by M. Al-Kalthomi Est. for General Contracting (6 months @ SR 60,259). 

Project Manager

(24)

CEW2262 Enhanced Oily Wastewater Treatment Systems: Treatment of Oily Wastewater Using Immersed Membrane Processes, funded by Saudi Aramco (18 months @ SR 900,000).

Project Manager

(25)

CEW2283 Environmental and Social Impact Assessment for Seismic Operations in the CV3 Concession Area in Rub Al-Khali Desert of Saudi Arabia, funded by the Saudi Company for Environmental Works Limited (4 months @ SR 150,000).

Task Leader

(26)

CEW2256 Oceanographic Survey in Support of the Marine and Coastal Damage Assessment, funded by Saudi Aramco (16 months @ SR 25,900,000).

Task Leader

(27)

CEW2292 Environmental Baseline Study – Rabeigh Development Project, funded by Foster Wheeler Arabia Ltd (13 months @ SR 326,985).

Task Leader

(28)

CEW2293 Study of Al-Khafji Seawater and Marine Habitat, funded by Saudi Aramco (17 months @ SR 889,021).

 Task Leader

(29)

CEW2301 Environmental Assessment of Small-Scale Oil Spill off Al-Jubail, Eastern Saudi Arabia, funded by Saudi Aramco Shell Refinery Co (12 months @ SR 447,500).

Task Leader

(30)

CEW2304 Environmental Impact Assessment of the Breakwaters in the Aziziyah Area, funded by Saudi Trading and Contracting Company (6 months @ SR 427,500).

Task Leader

(31)

CEW2310 Environmental Impact Assessment of the New Khursaniya 30” Dia. Pipeline (BI-10-08022), funded by Saudi Aramco (5 months @ SR 753,598).  

Task Leader

(32)

CEW2311 Environmental Impact Assessment – Upgrade Northern Area Oil Operations Offshore Platforms Wastewater, funded by Saudi Aramco (4 months @ SR 470,200).

Task Leader

(33)

CEW 2333 Study on the Suitability of Dolocrete Products for Stabilization of Hazardous Waste, Funded by Clean Environmental Technologies (9 weeks @ SR 53,464).

Project Manager

(34)

CEW2356 Environmental Impact Assessment of Existing and Proposed Integrated Hazardous Waste Management Facilities in the Eastern Province, funded by M. Al-Kalthomi Est. for General Contracting (6 months @ SR 80,000).

Project Manager

(35)

AR-23-18       Development and Utilization of the Supported Liquid Membrane Technique for the Removal of Selected Chemical Species from Industrial Waste Effluents.  Funded by KACST.

Co-Investigator

(36)

AR-27-99       Integrated Management of Oil Fuel Flyash Produced at Power Plants.  Funded by KACST (two years @ SR 589,000).

 

TOP

Principle Investigator