List of Publications
Books:
1. Adel Alshibani. Planning and controlling of earthmoving operations: State of the art, LAP Lambert Academic Publishing (2016), ISBN-13-978-3-659-82948-2.
Journal Papers:
1.
O Alshamrani, A Alshibani, M Alogaili (2018). Analytic Hierarchy Process
& Multi Attribute Utility Theory Based Approach for the Selection of
Lighting Systems in Residential Buildings: A Case Study, Buildings 8
(6), 73.
(ISI journal).
2.
A Alhajri, A Alshibani (2018). Critical
Factors behind Construction Delay in Petrochemical Projects in Saudi
Arabia. Energies 11 (7), 1-18. (ISI journal).
3.
Bakhter Ihsan, Adel Alshibani . (2018), Factors affecting operation and
maintenance cost of hotels, Type: Case study. Property Management,
Volume: 36 Issue: 3.
(ISI journal).
4.
Adel Alshibani, Mohammad A. Hassanain, (2018) "Estimating facilities
maintenance cost using post-occupancy evaluation and fuzzy set theory",
Journal of Quality in Maintenance Engineering,
https://doi.org/10.1108/JQME-05-2017-0038 (ISI journal).
5.
Alshibani, A Alshmrani, O. (2017), ANN/BIM-Based Model for Predicting
Energy Cost of Residential Buildings in Saudi Arabia, Journal of Taibah
University for Science, 11(2017)1317–1329(ISI journal).
https://doi.org/10.1016/j.jtusci.2017.06.003.
6.
Alshibani, A., and Moselhi, O. (2017), Productivity Estimation of Heavy
Construction, A Case Study from Montreal, submitted to journal of Slovak
Journal of Civil Engineering’.
(ISI journal).
7.
Osama Moselhi, Ibrahim Bakry, and Adel Alshibani (2016) “Accelerating
Repetitive Construction Projects with Uncertainty and Contractors
Judgement.”, Canadian Journal of Civil Engineering, 2016, 43(11):
949-957, 10.1139/cjce-2014-0347.
(ISI journal).
8.
Adel Alshibani and Osama Moselhi (2016). Productivity based method for
forecasting cost & time of earthmoving operations using sampling GPS
data. Journal of Information Technology in Construction (ITcon), Vol.
21, pg. 3956,
http://www.itcon.org/2016/3.
(ISI journal).
9.
Moselhi, O., and Alshibani, A., (2013). “Schedule Compression Using
Fuzzy Set Theory and
Contractors Judgment” Journal of Information Technologies in
Construction, Vol. 18, pp. 64- 75.
(ISI journal).
10.
Alshibani, A., and Moselhi, O., (2012)."Dynamic Risk Modelling for
Optimizing Earthmoving Operations", Journal of Civil Engineering Science
(JCES) , Vol. 1 N (1), 1-8.
11.
Alshibani, A., and Moselhi, O. (2012), “Least Cost Optimization of
Pushers-Scrapers Fleet Operations.” Can. J. Civ. Eng. 39: 313–322.
(ISI journal).
12.
Montaser, A., Bakry, I., Alshibani, A., Moselhi, O. (2012). “Estimating
Productivity of Earthmoving Operations Using Spatial Technologies.” Can.
J. Civ. Eng. 39: 1072–1082.
(ISI journal).
13.
Alshibani, A., and Moselhi, O. (2012), “Fleet Selection for Earth-moving
Projects Using Optimization-based Simulation.” Can. J. Civ. Eng. 39(6):
619-630.
(ISI journal).
14.
Moselhi, O., and Alshibani, A. (2009). Optimization of Earthmoving
Operations in Heavy Civil Engineering Projects. Journal of Construction
Engineering and Management. 135: 948-954.
(ISI journal).
15.
Alshibani, A. (2008). “Tracking and Control of Earthmoving Operations
Using Spatial Technologies.” Cost Eng. J., 50(10), 26-33.
(ISI journal).
16.
Moselhi, O., and Alshibani, A., (2007). “Crew Optimization in Planning
and Control of Earthmoving Operations Using Spatial Technologies.”
Journal of Information Technologies in Construction, Vol. 12, pp.
121-137.
(ISI journal).
Conference
Papers:
1.
Alshibani, O. Alshamrani & M. Essam Shaawat., (2018). “Construction
costs estimating model for low rise residential buildings”, 1st
International Conference on Urban Growth and the Circular Economy, 8—10
May 2018, Alicante, Spain.
2.
El Fathali, H., Rwelamila,
P., Moselhi, O. and Alshibani, A., (2018). “Selecting the private
partner in public private partnerships using topsis method|”. 19th
International Academy of African Business and Development Conference.
MAY 2018. Pp. 545-554.
3.
Alshibani, A ., El Fathali,
H., Rwelamila, P., Ajairi, F., and Alawad, M., (2018), “ Estimating
weather impact on the duration of outdoor construction activities in
Saudi Arabia”. 19th International Academy of African Business and
Development Conference. MAY 2018. Pp. 515-523.
4.
El Fathali, H., Alshibani,
A., Rwelamila, P., Albannaym, H., (2018). “Project schedule compression
using multifactor evaluation process (MFEP)”. 19th International Academy
of African Business and Development Conference. MAY 2018. Pp. 535-544.
5.
Adel Alshibani and Othman
Alshamrani (2016) “Artificial Neural Network Based Model For Estimating
Construction Cost Of Mosque Buildings In KSA” First International
Conference on Mosques Architecture, university of Dammam, KSA.
6.
Adel Alshibani and Othman
Alshamrani, (2016). "
Fuzzy Based
Method for
Dynamic Construction
Contingency in
Infrastructure
Projects with
Long Duration
in KSA", Proceedings
of the
Second International
Conference on
Infrastructure
Management, Assessment
and
Rehabilitation Techniques, Organized by Americ an University of
Shareqah, 8-10 MAR 2016, (ICIMART’16).
7.
Alshibani, A., (2015). “Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors’
Judgment”.
International Conference
on Construction Engineering and Project Management (ICCEPM 2015), South
Korea.
8.
Alshibani, A., and Moselhi,
O. (2012),“Stochastic Method for Forecasting Project Time and Cost”,
Construction Research Congress, West Lafayette, Indiana, United
States, May 21-23, 2012, ASCE 2012, pp. 545-555.
9.
Moselhi, O., and Alshibani,
A., (2011). “Cost and Experience Based Method for Project Acceleration.”
the Sixth International Structural Engineering and Construction
Conference (ISEC-6) Zürich, Switzerland, 21-26 June 2011.
10.
Montaser, A., Bakry, I.,
Alshibani, A., Moselhi, O. (2011). “Estimating Productivity of
Earthmoving Operations Using Spatial Technologies.” the 3rd
International/9th Construction Specialty Conference, Ottawa, Ontario,
June 14-17, 2011.
11.
Alshibani, A., and Moselhi,
O., (2010). “Automated System for Productivity Assessment of Earthmoving
operations.” 27th International Symposium on Automation and Robotics in
Construction (ISARC 2010) Bratislava, Slovakia, 25-27 June 2010.
12.
Alshibani, A., and Moselhi,
O., (2007). “Tracking & Forecasting Performance of Earthmoving
Operations Using GPS.” Construction Management and Economics 25th
Anniversary Conference, University of Reading, UK, July 2007.