COE 446 Term Projects 112 |
Project Requirements
§ A power point presentation at the
end of the project
§ A demo at the end of the project
§ A technical report as described
below showing the engineering approach
Project Duration
4
weeks
Report Format
§ Abstract
§ Introduction
§ Description of the problem
§ Small literature survey
§ Description of the implemented code
or package with flow charts
§ Discussion of the results
§ Conclusions
Project Titles:
Controlling an RC Car Wirelessly via Laptop