Technical Memorandum
1. Geothermal Power Resource Assessment, June 2005.
2. Expert system for Corrosion Assessment and Material Selection, June 2005.
3. Techno-Economical Feasibility Study of Grid Connected Photovoltaic System for Peak Load Shaving, Prepared for Submittal to Saudi Electricity Company, May 2004.
4. Testing of Water Meters, Prepared for Submittal to Ministry of Water & Electricity in October 2003.
5. On the usage of Cement Kiln Dust (CKD), Prepared for Submittal to Arabian Cement Company, October 2003.
6. Material Corrosion Research, Prepared May 2003.
7. Corrosion Expert System, Prepared May 2003.
8. Investigation of Bulk Storage Tanks, Prepared April 2003.
9. Remaining Life Assessment of steam Reformers, Prepared December 2002.
10. Wind Power Potential Assessment for Saudi Arabia, Prepared March 2000.
11. Investigation of Potential Benefits of Weather Modification on Rain Enhancement (PN11150)-Concept Proposal, Prepared in 1996.
12. Development of Database Management Information System for Saudi Arabian Basic Industrial Company (SABIC)-Technical Discussion Paper, Prepared in 1998.