Attachment I
Proposals
1. Study on
Industrial Usage of Cement Kiln Dust, Arabian Cement Company, Jeddah, Submitted
November 2003.
2. Study of New
Cement Products – Phase II: Market, Technical and Economic Feasibility, Eastern
Province Cement Company, Dammam, Submitted October 2003.
3. Study of Grid
Connected Wind Farm - Phase II, Saudi Electricity Company,
4. Electricity
for Remote Villages – Phase II, Saudi Electricity Company,
5. Study of Grid
Connected Wind Farm, Saudi Electricity Company,
6. Electricity
for Remote Villages – Phase II, Saudi Electricity Company,
7. Study of New
Cement Products – Phase I, Eastern Province Cement Company, Dammam, Submitted
October 2001.
8. Size
Optimization of Concrete Thrust Anchors for Pipelines, SAUDI ARAMCO, Dhahran,
2001.
9. Study of
Concrete Reinforced with Latifia Polymer Grid, Al-Latifia Factory for Plastic
Mesh,
10. Study of
Concrete Failure in the Outflow Channel of Qurayyah Power Plant, prepared for
SCECO-EAST, 2001.
11. Study of
Styrenbuild Blocks for Usage in Hordi Slab System, prepared for STYRENPACK, The
National Factory for Polystyrene Pack Co. Ltd., Jeddah, 2001.
12. Design of Dust
Collection System for Powder Power Plant of FOSAM Company, Service Quotation
Prepared for FOSAM Company, Jeddah, 2001.
13. Structural
Adequacy of Building Frames in FOSROC’S Jeddah Plant, Service Quotation
Prepared for FOSAM Company, Jeddah, 2001.
14. Seismic
Investigation of
15. Analysis of
Water used in Chilled Water System, Service Quotation Prepared for PLASTICO,
Al-Hasa. 2001.
16. Evaluation of
Trasparent Plastic Exposed in Natural Weather Conditions of Saudi Arabia,
Service quotation Prepared for Advanced Electronics Company (AEC) Ltd.,
17. Evaluation of
Trasparent Plastic in Artificially Accelerated Weatherometer, Service quotation
Prepared for Advanced Electronics Company (AEC) Ltd.,
18. Testing of
Sound Attenuators, Service Quotation Prepared for Saudi Technical Limited,
19. Comparative
Study of the Magnesium Oxide Samples, Service Quotation Prepared for Arabian
Tiles Co.,
20. To Study the
Effect of Weather Parameters and Detergents on Color Pigments used in Ceramic
Tiles, Service Quotation Prepared for Arabian Tiles Co., Riyadh, 2000.
21. Storm Water
Drainage Study for
22. Reliability
Database Information Management System for Industrial Corrosion Control and
Maintenance for SABIC R&D, Riyadh-Proposal, 2000.
23. Wind Power
Potential Assessment in Saudi Arabia-KACST Limited Grant Proposal, 2000.
24. Computation of
Volume and Cost Estimates of Glass Reinforced Concrete (GRC) Elements, Arabian
Tiles Co.,
25. Study of
Corrosion in Pipes, PLASTICO, Al-Hassa, 2000.
26. Improvement of
Process and Procedures in Al-Khorayef ESP Workshop,
27. Heat Exchanger
Tube Sheet Hole Enlargement Limits, Prepared for SAUDI ARAMCO, Dhahran, 1999.
28. To Assess the
Remaining Life of Rerformer Tubes, Ar-Razi Saudi Methanol Company, Jubail,
1999.
29. Determination
of Percentage Amount of Zerconia in the Fiber Sample, Service Quotation
Prepared for Arabian Tiles Co.,
30. Scope for
Consultation Work Program Al-Ittefaq Steel Products Factory-Proposal, 1999.
31. Investigate
the Possibility of Replacing the Currently used MgCl2 Flakes by Deadsea Water
or Drilling Brine, Service Quotation Prepared for Arabian Tiles Co.,
32. Study of
Corrosion in Hydraulic System, Service Quotation Prepared for
33. Implementation
of MIS and Design of Decision Support System (DSS) for the Research
Institute-Proposal, 1997.
34. Automatic
Detection of Hydrogen Induced Crack from Ultrasonic Nondestructive Testing
Signals for Saudi Aramco, 1996.
35. Development of
MIS for Zuhair Fayez and Associates Architectural and Engineering Consultants,
Jeddah-Proposal, 1996.