Solid Waste Management Planning Guide for
Aramco Communities. Funded by Saudi
Aramco, 1984, PN 24065.
Duration :
01 Mar
1984 – 31 Dec 1984
Project Cost : SR 685,000
Role : TL
2.
Yanbu Ballast Evaluation Project. Funded by Saudi Aramco, 1983-85, PN 24038.
Duration :
01 Nov
1983 – 13 Jul 1985
Project Cost : SR 564,794
Role : M
3.
Hazardous Waste Management Plan for the
University of
Petroleum and
Minerals. In-house project, 1987-88, PN
14087.
Duration :
12 months
Project Cost : In-house study
Role : TL
4.
Environmental Database Management for the
Arabian Gulf.
As part of the Aramco sustaining studies project, 1984-1989, PN 24079.
Duration : 01
Oct 1984 – 30 Oct. 1990
Project Cost : SR 9,450,000
Role : M
5.
Northern Area Biological Study. Funded by
Saudi Aramco, 1984-86, PN 24059.
Duration : 01
Feb 1984 – 30 Sep 1986
Project Cost : SR 3,753,350
Role : M
6.
MEPA/ROPME Pilot Research Monitoring
Program. Jointly sponsored by MEPA and
ROPME. 1985-88, PN 24066.
Duration : 16
Mar 1985 – 15 Dec 1988
Project Cost : SR 5,481,987
Role : M
7.
Environmental Database Management
. An in-house study, 1986-87, PN
14096.
Duration : 1986 – 1987
Project Cost : Not specified.
Role : M
8.
Saudi Aramco Sustaining Research Project
- Environmental Studies Phase I – Numerical Modeling. Funded by Saudi Aramco, 1984-1989. PN 24079.
Duration : 01
Oct 1984 – 30 Oct. 1990
Project Cost : SR 9,450,000
Role : M
9.
An Assessment of Jeddah Oil Refinery’s
Air Pollution Emissions and its Impact on Ambient Air Quality. Funded by JORC,
Jeddah, 1988-1989, PN 24111.
Duration : 17
Sep 1988 – 16 Mar 1989
Project Cost : SR 221,447
Role :
TL
10.
Marine
Environment Impact Study of the Safaniya GOSP-IV Offshore facility. Funded by
Saudi Aramco, 1989-1990, PN 24129.
Duration : 11
Dec 1989 – 30 Sep 1990
Project Cost : SR 1,930,00
Role :
M
11.
Greenhouse
gas emission inventory for Saudi Arabia. Funded by Saudi Aramco, 1989-90, PN 24127.
Duration : 22
Nov 1989 – 15 Jan 1990
Project Cost : SR 281,250
Role :
M
12.
Wave
Climate Study. Funded by Saudi Aramco,
1989-1991, PN 24120.
Duration : 15
Aug 1989 – 15 Aug 1991
Project Cost : SR 375,000
Role :
M
13.
Oil
Spill Studies: Software development of GULFSLIK, a software package for
predicting movement of oil spills in the Arabian Gulf, 1986-93, In-house
project. This software was used
extensively in 1991 Gulf War.
Duration
: 1986 – 1993
Project Cost : Not specified.
Role :
M
14.
Arabian Gulf Oil Spill
Research Program. Sponsored by BECHTEL,
1991–1992, PN 24137: Simulating the fate and transport of oil spilled at Al-Ahmadi in Kuwait over the period
of January - May 1991 on daily basis during the Gulf war.
Duration : 01
Feb 1991 – 30 Sep 1992
Project Cost : SR 2,683,912
Role :
TL
15.
Saudi
Aramco Sustaining Research Project - Environmental Studies Phase II – Numerical
Modeling. Funded by Saudi Aramco,
1990-1994, PN 24131. Worked for the
development of the following hydrodynamic and environmental models:
HYDRO1: Three-dimensional hydrodynamic model for the Arabian Gulf.
HYDRO2: Three-dimensional hydrodynamic model for a user-defined
sub-region in the Arabian Gulf.
OILPOL: Oil spill fate and transport model for the Arabian Gulf.
PASPOL: Pollutant transport model for a user-defined sub-region in
the Arabian Gulf.
GULFTHRM : A model to
predict temperature field due to continuous thermal discharge in the Arabian Gulf.
Duration : 18
Aug 1990 – 30 Sep 1994
Project Cost : SR 8,185,167
Role :
M
16.
Groundwater
table rise in the land force area.
Sponsored by Ministry of Defense and Aviation, 1993, PN 23068.
Duration
: 1991 – 1993
Project Cost : 1,100,000
Role :
M
17.
Ras
Tanura refinery/terminal upgrade environmental impact
assessment. Sponsored by Saudi Aramco,
1992-1993. Development of a
three-dimensional hydrodynamic model for wind-driven and tidal circulation to
analyze the thermal plumes in the Ras Tanura sea area for typical seasonal wind
conditions, PN 24142.
Duration : 15
Aug 1992 – 15 April 1993
Project Cost : SR 1,098,000
Role :
M
18.
Assessing
the risk of oil pollution to the west coast of Bahrain. Sponsored by BAPCO, Bahrain. Modeling of the likely trajectories and fate
of oil spill originating from an underwater pipeline near Bahrain, 1995, PN
24132(SQ 4295).
Duration
: 1 month
Project Cost : SR 9,823
Role :
M
19.
An
assessment of SO2 emission from Jeddah oil refinery using dispersion
model. Sponsored by Saudi Aramco, 1996, PN 24132(SQ4430).
Duration
: 2 months
Project Cost : SR 200,000
Role :
M
20.
Develop
a mathematical model to determine the trajectories and fate of any surface oil spill in the Red Sea. Sponsored by Protection of Environment for Red Sea and Gulf of Aden (PERSGA), 1996,
PN 24132(SQ4443).
Duration
: 6 months
Project Cost : SR 93,750
Role :
M
21.
Meteorological
and air quality baseline studies. Funded by SCECO-East, Dhahran, 1994-96, PN
24149.
Duration :
10 Aug
94 – 20 Jan 96
Project Cost : SR 1,680,046
Role :
M and
Coordinator for
report writing.
22.
Saudi
Aramco sustaining research project - environmental studies phase
III – produced water modeling. Funded by
Saudi Aramco, 1995-2000, PN 24154.
Duration : 01
Jul 95 – 31 Dec 00
Project Cost : SR 7,200,004
Role :
TL
23.
National
inventory of anthropogenic emissions by source and removal by sinks of
greenhouse gases not controlled by the Montreal Protocol. Funded by Saudi Aramco, 1997-1999, PN 24163.
Duration : 01
Oct 97 – 23 May 99
Project Cost : SR 576,698
Role :
TL
24.
Development
of environmental modeling software packages for the Arabian Gulf (In-house
study). Under this scheme the following
software packages were developed.
HYDRO1: Three-dimensional hydrodynamic model for the Arabian Gulf. Version 2.0 (1996).
HYDRO2: Three-dimensional hydrodynamic model for a user-defined
sub-region in the Arabian Gulf. Version 2.0 (1996).
GULFTRAK: Oil spill trajectory model for the Arabian Gulf. Version 1.0 (1995) and Version 2.0 (1996).
OILPOL: Oil spill fate and transport model for the Arabian Gulf. Version 2.0 (1996).
OILPOL-S: Oil spill fate and transport model for a user-defined sub-region
in the Arabian Gulf. Version 2.0 (1996).
PASPOL: Pollutant transport model for a user-defined sub-region in
the Arabian Gulf. Version 2.0 (1996).
GULFTHRM : A model to
predict temperature field due to continuous thermal discharge in the Arabian Gulf. Version 1.0 (1994).
GULFSAL: A model to predict
salinity field due to continuous saline discharge in the Arabian Gulf. Version 1.0. (1998).
GULFDISP: A model to predict
salinity and thermal field due to continuous heated brine discharge in the Arabian Gulf. Version 1.0. (1999).
Demos: Development of
PC-based demos for all above software packages for marketing purpose.
Duration : Open
Project Cost : Unspecified
Role :
TL (for GULFTHRM, GULFSAL, and GULFDISP)
|