Projects

  1. Environmental Impact Assessment for Abu Safah offshore, served as a Member. Study and determine the potential level of impact on the marine environment of the construction and operation of various elements, 2002.
  2. Project Coordinator for the Investigation of Pollution Problems in Dammam Corniche Water, served as a Coordinator, 2002.
  3. Participation in 25 oceanographic cruises using the FerryBox system in English Channel and Bay of Biscay, studying the variation in phytoplankton speciation and growth due to hydrodynamic and chemical drivers between coastal and open ocean waters, served as a Coordinator, 2002-2005.
  4. Participation in Charles Darwin cruise CD173, 2005, responsible for the measurement of dissolved nutrients, served as a Task Leader This involved work with a Skalar Auto-Analyser measuring samples collected while the ship was underway and from water bottles on CTD casts. The target of this cruise was the better understanding of the biogeochemistry and hydrodynamics controlling blooms of plankton in summer conditions.
  5. Marine Environmental Sustaining Research Project – V conducted by the Marine Studies Section, Center for Environment & Water, Research Institute for SAUDI ARAMCO 2007-2012., served as a Project Manager
  6. Oceanor MINI-BUOYS Work Service, additional work with the study of the Assessment of Ras Tanura Marine Environment and Bioaccumulation Monitoring along the Saudi Coastal Waters of the Arabian Gulf 2007-2011, served as a member
  7. An Annual Environmental Monitoring Survey: Marine Ecological Survey and Bioaccumulation Studies and Groundwater Quality Survey of the Petro Rabigh Site 2009-2010., served as a member
  8. Conduct LC-50 Drilling Fluid Sampling and Toxicity Testing 2009-2011, served as a Project Manager.
  9. Environmental Impact Assessment for Upgrade of the Fire Protection System, Ju’aymah Offshore Platform (BI-10-00185) Lines (BI-10-00917), 2009-2011 served as a Project Manager.
  10. Environmental Impact Assessment for Installing Instrument Scraping Facilities at Zuluf and Marjan Oil Fields February- April 2010, served as a Project Manager.

Previous                                                                                                 Next