| |
PUBLICATIONS
Papers in Refereed Journals
- Assaf, S.,
Al-Khalil, M., Al-Hazmi, M., “Causes of Delay in Large Building Construction
Projects,” Journal of Management in Engineering, Vol. 11, No. 2,
March/April, 1995.
[PDF] [Doc]
- Al-Khalil, M.,
Assaf, S., Abdul-Rahman, W. Asfoor, M. “Conceptual Cost Estimating Model for
Water Pipeline Projects,”
The Arabian Journal of
Science and Engineering.
Volume 23, Number 1C, June 1998.
- Al-Khalil, M.
Al-Ghafly, M., “Delay in Public Utility Projects in Saudi Arabia,”
International Journal of Project Management. Vloume 17, Number 2, April
1999.
- Al-Khalil, M.,
Assaf, S., Abdul-Rahman, W. Asfoor, M. “Conceptual Cost Estimating Model for
Water Reservoirs,”
Cost Engineering,
May 1999.
- Al-Khalil, M.
Al-Ghafly, M., “Important Causes of Delay in Public Utility Projects in Saudi
Arabia,” Journal of Construction Management and Economics, Vol. 17, No.
5, September 1999.
- Al-Khalil, M.
“Selecting the Appropriate Project Delivery Method using AHP”,
International Journal of Project Mangement, Vol. 20 (6), April 2002, pp.
469-474.
-
Al-Khalil, M., Assaf S., Al-Faraj T., and Al-Darweesh, A. “Measuring
the Effectiveness of Materials Management for Industrial Projects”,
Journal of Management in Engineering,
July 2004, ASCE.
- Al -Khalil, M.,
Assaf, S., Al-Anazi, F. “Risk-based Maintenance Planning of Cross-Country
Pipelines”, ASCE
Journal of Performance of Constructed Facilities,
2005, vol. 19, no2, pp. 124-131 ., ASCE.
Conference
Presentations
- Liou, F. &
Abdullatif, M., "Database Management Systems for Construction Managers," 1987
AACE Transactions, 1987.
-
Al-Khalil, M. “Activity-based Costing
Model for Construction Projects”. ICEC Melbourne 2002 3rd World Congress on
Cost Engineering, Project Management and Quantity Surveying, to be held in
14-18 April 2002, Melbourne, Australia.
- Assaf, S.,
Al-Khalil, M., Anazi, F., “The Use of Analytical Hierarchy Process in Risk
Ranking & Maintenance Planning”, The Second International Operation &
Maintenance Conference & Exhibition in the Arab Countries (OMAINTEC 2003), pp.
45-59, Beirut, Lebanon, June 30- July 3, 2003.
Invited Lectures
Al-Khalil, M. I.,
“Estimation for Water Pipelines,”
Lecture delivered to the AACE International – Arabian Gulf Section at Dhahran
International Hotel, May 28, 1995, Dhahran, Saudi Arabia
Technical Reports
1.
Assaf, S., Al-Hammad, A., Al-Khalil, M., Jannadi, O., “Proposal for
Post-Secondary Educational Facilities Study,” Research Institute, Economic
Division, January 1993.
2.
Assaf, S., Almohawis, S., Shash, A., and Al-Khalil, M. “Development and
Application of a Unified Cost Estimating System and Cost Index for Construction
Projects in Saudi Arabia,” Progress Report Number 3, KACST Project AR-12-021,
25-10-1993.
3.
Assaf, S., Almohawis, S., Shash, A., and Al-Khalil, M. “Development and
Application of a Unified Cost Estimating System and Cost Index for Construction
Projects in Saudi Arabia,” Progress Report Numbeer 4, KACST Project AR-12-021,
9-7-1994.
4.
Assaf, S., Almohawis, S., Shash, A., and Al-Khalil, M. “Development and
Application of a Unified Cost Estimating System and Cost Index for Construction
Projects in Saudi Arabia,” Progress Report Number 5, KACST Project AR-12-021,
4-1-1995.
5.
Al-Khalil, M. “Assessment of Schedule Delays at the
Sunset
Beach Resort Project”. An investigation requested by Owner to examine delays and
delay responsibility of the SR 170 millions (US $45.33 millions) project. Report
submitted on Octorber, 2001.
6.
Assaf, S., Bubshait, A., and Al-Khalil, M. “Proposal for the Revision of the
Construction Engineering & Management Graduate Program”, December 2003.
|