Size
Optimization of Concrete Thrust Anchor Blocks for Pipelines, Saudi Aramco, 2003-2007 (Member)
Study of Grid Connected Wind
Farm (Phase II) , Saudi Electric Company, 2004-2007 (Project Manager)
Study
of Grid Connected Wind Farm, Saudi Electric Company, 2003-2006 (Project
Manager)
Durability of Glass Fiber
Reinforced Plastic Bars Under Aggressive Local Exposure Conditions, Saudi Aramco, 2003-2007, (Member)
Study on New Cement Products
Phase II, Market, Technical & Economic Feasability, Eastern Cement Company, 2004-2006, (Member)
Study on New Cement Products
Phase I, Literature Review, Eastern Cement Company,
2002-2004,
(Member)
Impact assessment of structural modifications on a building in
Dammam, Ministry of Justice, Eastern Province, 2001. (Project Manager)
Storm Water Drainage Study for Dammam First Industrial City,
Dammam First Industrial City, 2000. (Project Manager)
Design and Fabrication of Sitz Bath, Mohammad Dossary Hospital,
Al-Khobar, 2000. (Project Manager
Evaluation of Transparent Plastic Exposed in Natural Weather
Conditions of Saudi Arabia, Advanced Electronics
Company, 2000. (Project Manager)
Specification for Silica Fume to Produce Durable Concrete, Saudi
Aramco, 1999 – 2001. (Member)
Investigation of Heat
exchanger Tube Sheet Hole Enlargement, Saudi Aramco, 2000. (Project
Solicitor, Executed by ME Dep.)
Evaluation
of the Weldability of Grade 2205 Duplex Stainless Steel, Saudi Aramco, 2000. (Project
Solicitor, Executed by ME
Dep.)
Analytical
Evaluation Technique for Storage Tanks, Saudi Aramco, 2000. (Project
Solicitor, Executed by ME
Dep.)
Computation
of Volume and Cost Estimates of GRC Elements, Arabian Tile Co. Ltd.,
2000. (Member)
Study
of Corrosion in the Hydraulic System of Platico Co., 2000. (Project
Manager)
To
investigate the Possibility of Replacing Flakes with Dead Sea or Saudi Aramco
Brine, Arabian Tile Co. Ltd., 1999. (Laboratory tests)
Determination
of Percentage Amount of ZERCONIA in the Fiber Sample, Arabian Tile Co. Ltd.,
1999. (Laboratory tests)
Improvement
of processes and procedures in Al-Khurayef workshops, Al-Khurayef Co., 1999. (Project Manager)
Study of Concrete Cracks in High Voltage Transmission Tower Footings in Sabkha Environment, Saudi Electricity Company, 1984-85. (Membe
An
Investigation on the Addition of Pozzolans to Improve the Durability Performance
of Concrete in Eastern Province, Royal
Commission for Jubail and Yanbu, 1982. (Member)
Research Project Proposals
Size
Optimization of Concrete Thrust Anchor Blocks for Pipelines, Saudi Aramco, 2003
Study of Grid Connected Wind
Farm (Phase II) , Saudi Electric Company, 2004
Study
of Grid Connected Wind Farm, Saudi Electric Company, 2003
Durability of Glass Fiber
Reinforced Plastic Bars Under Aggressive Local Exposure Conditions, Saudi Aramco, 2003
Study on New Cement Products
Phase II, Market, Technical & Economic Feasability, Eastern Cement Company, 2004
Study on New Cement Products
Phase I, Literature Review, Eastern Cement Company,
2002.
Impact assessment of structural modifications on a building in
Dammam, Ministry of Justice, Eastern Province, 2001.
Storm Water Drainage Study for Dammam First Industrial City,
Dammam First Industrial City, 2000.
Design and Fabrication of Sitz Bath, Mohammad Dossary Hospital,
2000.
Evaluation of Transparent Plastic Exposed in Natural Weather Conditions of Saudi Arabia, Service quotation Prepared for Advanced Electronics Company (AEC) Ltd., Riyadh, 2000.
Testing of Sound Attenuators, Service Quotation Prepared for Saudi Technical Limited, Riyadh, 2000.
Comparative Study of the Magnesium Oxide Samples, Service Quotation Prepared for Arabian Tiles Co., Riyadh, 2000.
Determination of Percentage Amount of Zerconia in the Fiber Sample, Service Quotation Prepared for Arabian Tiles Co., Riyadh, 2000.
Investigate the Possibility of Replacing the Currently used MgCl2 Flakes by Deadsea Water or Drilling Brine, Service Quotation Prepared for Arabian Tiles Co., Riyadh, 2000.
Analysis of Water used in Chilled Water System, Service Quotation Prepared for PLASTICO, Al-Hasa, 2000.
Seismic Investigation of AMIANTIT Head Quarters Building, Service Quotation Prepared for Fiberglass Pipes, AMIANTIT, Dammam, 2000.
Heat Exchanger Tubesheet Hole Enlargement Limits, Prepared for SAUDI ARAMCO, Dhahran, 2000.
Study of Styrenbuild Blocks for Usage in Hordi Slab System, prepared for STYRENPACK, The National Factory for Polystyrene Pack Co. Ltd., Jeddah, 2000.
Study of Concrete Failure in the Outflow Channel of Qurayyah Power Plant, prepared for SCECO-EAST, 2000.
To Study the Effcet of Weather Parameters and Detergents on Color Pigments used in Ceramic Tiles, Service Quotation Prepared for Arabian Tiles Co., Riyadh, 1999.
Evaluation of Transparent Plastic in Artificially Accelerated Weatherometer, Service quotation Prepared for Advanced Electronics Company (AEC) Ltd., Riyadh, 1999.
Structural Adequacy of Building Frames in FOSROC’S Jeddah Plant, Service Quotation Prepared for FOSAM Company, Jeddah, 1999.
Design of Dust Collection System for Powder Power Plant of FOSAM Company, Service Quotation Prepared for FOSAM Company, Jeddah, 1999.
Storm Water Drainage Study for Dammam Industrial City, Service Quotation Prepared for Dammam First Industrial City, 1999.
Evaluation of fiberglass poles in lieu of steel poles prepared for submittal to SHAIRCO for Trading Industry & Contracting, 1999.
A member of a Research Institute team for a proposal project on Saudi Arabian Building Code accepted 1996, funded by Saudi Chamber of Commerce and Industry.
Diagnostic Evaluation and Repair of Deteriorated Concrete Structures in Saudi Arabia, AR-09, Project proposal submitted to King Abdulaziz City for Science and Technology, 1987.
Development of Cement and Slurry Systems for Saudi Arabian Oil-Wells, AR-08, Project proposal submitted to KACST, December 1985.
New Cement Specifications for Durable Concrete in Saudi Arabia, AR-06, Project proposal submitted to KACST, October 1984.