Adel A. Abdou

They know enough who know how to learn

Adel A. Abdou

They know enough who know how to learn

 

 

 

                                              

The fellow who does things that count, doesn't usually stop to count them

 

                                                                                      

                                                                                                                                                                                      

                                                                                                                                    

      Consulting Services
       
     

Provided an “Assessment of Equipment High Noise Level” in the Advanced Materials Science Laboratory, in the Mechanical Engineering Dept., KFUPM. Consulting work included acoustical measurements, technical specifications and remedial measures in both source and receiving lab rooms with respect to materials and installations to overcome the noise-induced hazards. (A brief Report with drawings was submitted), 1996.

       
     

Provided a consulting service on the “Acoustical Noise Baseline and Impact Assessment of Prince Sultan Bin Abdulaziz Center for Science and Technology”, (SCI-TECH), Al-khobar, Saudi Arabia, prepared for HOK, USA, 1997.

       
      Conducted an Investigation of the Occupational Noise Conditions in KFUPM Press, field measurements were conducted, a brief technical report was submitted to the Press and the University Administration, 1999.
       
      Provided an “Assessment of the Acoustical Performance of KFUPM Schools’ Gymnasium”, a technical report was submitted to the KFUPM Schools’ Administration, 1999.       
       
     

Provided a consulting service included the “Testing of the Thermal Conductivity of 7 Specimens of Thermal Insulations for the Civil Eng. Dept., KFUPM. Measurements were conducted, results analyzed and reported, 2001.

       
     

Provided a consulting service to the Technical Supervisor Office (KFUPM) for recommending a wall assembly, among three alternatives (from the acoustical viewpoint), to be constructed between offices in the multipurpose hall building (Bldg54) on Campus, 2002.

       
     

Conducted, a “Noise Baseline Survey in and around Rabigh Refinery Plant”, Rabigh, Saudi Arabia, a part of an comprehensive Environmental Impact Assessment Study prepared for Foster Wheeler Energy Ltd. (FWEL), UK, 2004. (KFUPM, RI, Project CEWxxxx).

       
     

Conducted, a “Noise Baseline Survey in the New Development Site of Khurais Central Processing Facilities”, Khurais, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA) prepared for Foster Wheeler Energy Ltd. (FWEL), UK, 2005. (KFUPM, RI, Project CEW0231).

       
     

Conducted, a “Archaeological Survey in the New Development Site of Khurais Central Processing Facilities”, Khurais, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA)prepared for Foster Wheeler Energy Ltd. (FWEL), UK, 2005. (KFUPM, RI, Project CEW02321).

       
     

Conducted, a “Noise Baseline Survey, in the New Development Site of Manifa Central Processing Facilities”, Manifa, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA) prepared for Foster Wheeler Energy Ltd. (FWEL), UK. 2007. (KFUPM, RI, Project CEW02341).

       
     

Conducted, a “Archaeological Survey, in the New Development Site of Manifa Central Processing Facilities”, Manifa, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA) prepared for Foster Wheeler Energy Ltd. (FWEL), UK. 2007. (KFUPM, RI, Project CEW02341).

       
     

Conducted, a “Noise Baseline Survey, in the New Development Site of King Abdulla University of Science and Technology (KAUST)”, Thuwal, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA)) prepared for ARAMCO, Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02345).

       
     

Conducted, a “Archaeological and Heritage Survey, in the New Development Site of King Abdulla University of Science and Technology (KAUST)”, Thuwal, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA)prepared for ARAMCO, Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02345).

       
     

Conducted, a “Noise Impacts and Mitigation Measures, in the New Development Site of King Abdulla University of Science and Technology (KAUST)”, Thuwal, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA)prepared for ARAMCO, Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02345).

       
     

Conducted, a “KAUST Central Utility Plants (CUP): Noise Impacts and Mitigation Measures, in the New Development Site of King Abdulla University of Science and Technology (KAUST)”, Thuwal, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA) prepared for ARAMCO, Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02345-1).

       
     

Conducted, a “Archaeological Survey, in the new site of Karan Pipeline Development”, Khursaniyah, Saudi Arabia, a part of an Environmental Impact Assessment Study (EIA) prepared for ARAMCO, Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02357).

       
     

Conducted, a “Vehicle-Traffic Noise Survey”, Rabigh, Saudi Arabia, a part of an Environmental Program of Works (SFC No.079) prepared for Rabigh Refining and Petrochemicals Company (Petro-Rabigh), Saudi Arabia. 2007-08. (KFUPM, RI, Project CEW02358).

       
      Education is the progressive realization of our ignorance
       
      Qualifications | Experience | Teaching | Research | Consulting | Useful Links 
     

                      Copyright 2008 | Adel A. Abdou | KFUPM

     

                             Last Updated: March 31,2008

     

                                 This homepage can be best viewed with desktop resolution of 1024x768